Hardware
testing involved a systematic approach to built interfacing circuit which is
beginning with testing the component and connection.After the connection is
functional, the full circuit is construct. However, there are a few problems
faced during the hardware development such as the speaker is not functioning
and the connection loss between control panel circuit and GSM modem that cause
the alert message was not delivered. . Then the circuit was troubleshoot by
changing the speaker and RS 232 cable with the new one and solder it to the
circuit as shown in figure below.